A.6 The Matrix Uploaded
The final project for this seminar is to revisit
all the work prepared on your mentor building this semester and make revisions based
on comments and discussions. The work will be pinned-up during our last class for a
final review.
Pin-up, Oct 16
The work will be pinned-up
in a matrix that compares all buildings by analysis category.
As with past projects,
- All diagrams and descriptions must be original
(hand or digital).
- Each diagram must have a title, and should be
labeled as appropriate.
- Each diagram must fit on a 5.5 " x 5.5 " piece
of paper, and maintain a margin of at least 1/4 inch from each
edge.
The required diagrams are as follows:
Title
Design Intentions
Structure 1 - Concept
Structure 2 –Structure+Site
Structure + Enclosure
Services Plan
Services Section
Floor/Ceiling distribution
Detail - Definition
Detail – Movement
Detail – Water
Detail – Three-way
Bibliography
Final Submission, Oct 18
All work pinned up in the Final Matrix and the final checklist are to be submitted to BbLearn as single PDF using the labeling standards
Final submissions are due no later than 5 pm, October
18.
|